iasgroup was engaged to develop and deliver a tank failure control mechanism for nine Nickel tanks at a mine and processing facility in the south of Western Australia.
The unique project required reinstating the structural integrity as the tanks were at risk of splitting from substantial expansion, which had the potential to result in rapid loss of containment.
The project had the following specifications:
Structure | Steel tanks |
Application Type | Carbon Fibre Banding |
Operating Environment | Remote Mine Site |
Quantity | 9 |
Tank Diameter | 9.26-14.10m |
Tank Height | 8.35-13.80m |